The short answer—with the scope attached
This Old House reports a typical electrical panel upgrade range of $800–$4,000, with many homeowners at $1,300–$3,000 for a 100A-to-200A upgrade. Angi reports $1,200–$2,000 as its typical range and $1,600 as its average.
These figures should not be averaged into a fake “Massachusetts price.” They come from different datasets and scope descriptions. They are national planning benchmarks reviewed in November 2026, not an offer or a quote for Worcester County.
The useful question is: which equipment and work are included?
Cost by service size: published scenario table
This Old House publishes the following national figures. “Panel only” excludes the installed project; “new installation” is a different scenario from replacing existing equipment.
| Service size | Panel only | Panel + installation | New installation |
|---|---|---|---|
| 100A | $100–$200 | $800–$1,500 | $1,200–$1,600 |
| 200A | $250–$350 | $1,300–$3,000 | $1,800–$2,500 |
| 300A | $350–$500 | $1,800–$3,500 | $2,000–$4,500 |
| 400A | $500+ | $2,000–$4,000 | $4,000–$6,000 |
Do not select an amperage by matching a budget row. The panel sizing and load-calculation guide explains why existing and future loads determine the design.
Replacement versus a true service upgrade
A like-for-like panel replacement may leave service amperage unchanged. A service upgrade can involve more than the indoor panel: main disconnect, service conductors, meter base, grounding and utility disconnect/reconnection may be included depending on the property.
This is why “200A panel installed” is an ambiguous scope. Ask whether the quote changes the service itself or only installs equipment rated for 200A.
| Quote item | Why it matters |
|---|---|
| Panel, main breaker and branch breakers | Defines the equipment actually supplied |
| Service entrance conductors | Distinguishes a service upgrade from a box swap |
| Meter base or mast work | Can add labor and utility coordination |
| Grounding and bonding corrections | Property-specific work that should not be hidden in an allowance |
| Permit and inspection | Confirms who handles local requirements and fees |
| Utility disconnect/reconnection | Affects scheduling and the outage plan |
| Finish repair | Often excluded after relocation or wiring changes |
Related work that changes the total
This Old House separately lists these national ranges:
- Subpanel installation: about $400–$1,750. Useful for distribution and breaker positions, but not additional utility capacity.
- Panel relocation: about $800–$3,000, depending on distance and rewiring.
- Main breaker replacement: about $200–$300, with larger repairs potentially requiring a broader scope.
- Meter box: $50–$250 for the unit; installed work can be substantially higher when service coordination is involved.
- AFCI/GFCI breakers: an added $35–$60 per breaker in the source’s scenario.
- Permits: $50–$300 depending on location in the source’s national guide.
These figures are not additive by default. Some may already appear in a complete quote; others may not apply. Use them as questions, not as a self-built contractor estimate.
The labor behind the number
The panel enclosure is usually not the largest part of an installed project. Labor includes removing and reconnecting circuits, service work, labeling, corrections and coordination. Access, existing wiring condition, equipment location and the number of circuits all affect the job.
Relocating a panel can introduce conductor extensions, junctions, wall work and finish repairs. An older property may also have active legacy wiring that remains a separate scope; a new panel does not constitute knob-and-tube replacement.
Massachusetts permits and local requirements
Massachusetts recommends that consumers ask to see the permit and obtain written scope and pricing. Worcester’s Building & Zoning division issues electrical permits and conducts associated inspections. The city states that an application alone is not approval to begin work.
For Worcester projects, ask who uses the city portal and schedules inspection. For Sutton, confirm current requirements through the town’s online Building & Zoning process. If utility work is needed, include coordination in the project sequence rather than treating reconnection as automatic.
How to compare three estimates
- Give every contractor the same current and planned load list.
- Require the proposed service rating and the basis for it.
- Separate panel equipment from service conductors, meter and grounding work.
- List permit, inspection and utility responsibilities.
- Identify drywall, siding, painting and restoration exclusions.
- Ask for alternatives where a subpanel, managed load or targeted repair is technically appropriate.
A Level 2 EV charger or standby generator can change the load and equipment conversation, so include those plans before the panel design is finalized.
Use the project planner to prepare the same brief for each estimate.